A major construction project is causing the Long Island Rail Road to cancel five different trains for a month.
During the evening rush, the 6:05 p.m. train to Wantagh from Penn Station and the 6:33 train to Babylon from Penn Station are both cancelled. In the morning, the 6:54 a.m. train from Central Islip, the 7:55 a.m. from Little Neck and the 8:30 a.m. from Freeport are also cancelled.